Project:
Mezzanine Flooring Project completed by HuntOffice Interiors Project
Details: Mezzanine floor system was installed in the warehouse area,
converting an unused warehouse space into new offices & meeting rooms
Mezzanine floor was installed in single-tier level with chipboard
decking, creating the extension of existing first floor. It was a
perfect solution for incorporating additional offices into the building.
Works were carried out under the scheduled time frame with minimum
disruption to the office staff. |
Product Specification
- Product Code
- H44066775
Product Details
- Mezzanine Flooring Project By HuntOffice Interiors
Mezzanine floor system was installed in the warehouse area, converting an unused warehouse space into new offices & meeting rooms Mezzanine floor was installed in single-tier level with chipboard decking, creating the extension of existing first floor. It was a perfect solution for incorporating additional offices into the building. Works were carried out under the scheduled time frame with minimum disruption to the office staff.